Details

Financial Management in Construction Contracting


Financial Management in Construction Contracting


1. Aufl.

von: Andrew Ross, Peter Williams

46,99 €

Verlag: Wiley-Blackwell
Format: PDF
Veröffentl.: 30.11.2012
ISBN/EAN: 9781118537978
Sprache: englisch
Anzahl Seiten: 456

DRM-geschütztes eBook, Sie benötigen z.B. Adobe Digital Editions und eine Adobe ID zum Lesen.

Beschreibungen

<p><b>Financial Management in Construction Contracting<BR> Andrew Ross & Peter Williams</b> <p>This authoritative text provides a detailed insight into how construction companies manage their finances at both corporate and project level. It guides students and practitioners through the complexities of the financial reporting of construction projects within the constraints of accepted accounting practice. The book is written for non-accountants and from a contractor’s perspective and is equally relevant to subcontractors and main contractors. <p>The authors examine the relationship between the external annual accounts and the internal cost-value reconciliation process. CVR is covered in depth and the authors consider issues such as interim payments, subcontract accounts, contractual claims, final accounts, cash flow management and the reporting of the physical and financial progress of contracts. <p>A broad perspective of all the financial aspects of contracting is taken along with related legal issues and the authors explain how things operate in the ‘real world’. They describe good practice in financial control while at the same time being honest about some of the more questionable practices that can - and do - happen. The approach taken is unique as the financial management of construction projects is considered from the perspective of the contractor’s quantity surveyor. The book deals with the real issues that surveyors have to address when using their judgment to report turnover, profitability, cash flow, and work in progress on projects and the financial problems faced by subcontractors are frankly and pragmatically explored. <p>The payment and notice requirements of the Construction Act are explained in detail and relevant provisions of JCT2011, NEC3, ICC, DOM/1 and other standard contracts and subcontracts are also covered. <p><b>Financial Management in Construction Contracting</b> addresses the wide variety of external factors that influence how construction companies operate, including government policy, banking covenants and the financial aspects of supply chain management. Cost reporting systems are described and real-life examples are used to illustrate cost reports, accrual systems and how computerised systems can be employed to provide the QS with information that can be audited. <p>This is the ideal core text for final year degree and post-graduate students and provides an invaluable reference source for all engaged in the financial management of construction projects. <p>This book’s companion website is at <b>www.wiley.com/go/rossfinancialmanagement</b> and offers invaluable resources for both students and lecturers: <ul><li>PowerPoint slides for lectures on each chapter</li> <li>Excel worksheets to practice what you learn</li> <li>Sample valuations and cashflows</li></ul>
<p>About the Authors xvii</p> <p>Preface xviii</p> <p>1 Finance in the construction industry 1</p> <p>1.1 Introduction 1</p> <p>1.2 The purpose of this book 2</p> <p>1.3 Construction contracting 3</p> <p>1.4 Work in progress 3</p> <p>1.5 Reporting 4</p> <p>1.6 Structure of the book 5</p> <p>1.7 The construction industry 6</p> <p>1.7.1 Industry reports 6</p> <p>1.7.2 Industry reform: origins and responses 7</p> <p>1.7.3 Housing Grants, Construction and Regeneration Act 1996 9</p> <p>1.8 Industry output 12</p> <p>1.9 Industry clients 15</p> <p>1.9.1 Clients for small buildings 16</p> <p>1.9.2 Major clients developing for their own occupation 16</p> <p>1.9.3 Property developers 17</p> <p>1.9.4 Private house buyers 17</p> <p>1.10 Structure of the industry 17</p> <p>1.10.1 Size and distribution of firms 17</p> <p>1.10.2 Risk culture 19</p> <p>1.10.3 Specialist contractors 20</p> <p>1.10.4 Payment processes 21</p> <p>References 22</p> <p>2 Stakeholders and the regulatory environment 23</p> <p>2.1 Accounting 24</p> <p>2.1.1 Accounting reference period 24</p> <p>2.1.2 Accounting reference date 24</p> <p>2.1.3 Statutory compliance 24</p> <p>2.1.4 Annual accounts 25</p> <p>2.1.5 Audit procedures 26</p> <p>2.2 The Companies Acts 26</p> <p>2.3 Accounting standards 26</p> <p>2.4 UK accounting standards 27</p> <p>2.4.1 SSAP9 27</p> <p>2.5 International accounting standards 28<br /> <br /> </p> <p>2.6 Financial reporting 28</p> <p>2.7 Financial reports 29</p> <p>2.7.1 Management reports 30</p> <p>2.7.2 Lenders and banking covenants 31</p> <p>2.7.3 HMRC reports 33</p> <p>2.7.4 VAT returns 33</p> <p>2.7.5 Companies House 35</p> <p>2.8 Annual accounts 35</p> <p>2.8.1 Operating statement 36</p> <p>2.8.2 Directors’ report 36</p> <p>2.8.3 Profit and loss account 37</p> <p>2.8.4 Balance sheet 37</p> <p>2.8.5 Movement of funds statement 39</p> <p>2.8.6 Auditors’ report 39</p> <p>2.8.7 Notes to the accounts 41</p> <p>2.8.8 Group accounts 41</p> <p>References 41</p> <p>3 Risk and uncertainty 42</p> <p>3.1 Definitions 43</p> <p>3.2 Risk and reward 45</p> <p>3.2.1 Risk 46</p> <p>3.2.2 Reward 47</p> <p>3.3 Corporate governance 48</p> <p>3.3.1 Definition 48</p> <p>3.3.2 The Cadbury Report 48</p> <p>3.3.3 The Financial Reporting Council 48</p> <p>3.3.4 The Companies Acts 48</p> <p>3.3.5 The Turnbull Report 49</p> <p>3.4 Market risk 49</p> <p>3.4.1 Definition 49</p> <p>3.4.2 Market risk factors 49</p> <p>3.4.3 Governance 50</p> <p>3.5 Working capital 50</p> <p>3.5.1 Sources of working capital 50</p> <p>3.5.2 The annual accounts 51</p> <p>3.5.3 Loan capital 51</p> <p>3.5.4 Risk capital 54</p> <p>3.5.5 Overdrafts 55</p> <p>3.5.6 Trade credit 55</p> <p>3.5.7 PAYE, NIC and VAT 55</p> <p>3.5.8 Capital gearing 56</p> <p>3.5.9 Working capital ratios 56</p> <p>3.5.10 Liquidity 57</p> <p>3.5.11 Cash flow 57</p> <p>3.6 Competition 58</p> <p>3.6.1 Definition 58</p> <p>3.6.2 Procurement 58</p> <p>3.6.3 Subcontractors 58</p> <p>3.7 Profitability 59</p> <p>3.7.1 Definitions 59</p> <p>3.7.2 Income gearing 59</p> <p>3.8 Work in progress 60</p> <p>3.8.1 Payment in arrears 61</p> <p>3.8.2 Valuations and payments 62</p> <p>3.9 Insolvency risk 62</p> <p>3.9.1 Industry structure 63</p> <p>3.9.2 Sole traders 63</p> <p>3.9.3 Limited liability 63</p> <p>3.9.4 Large firms 64</p> <p>3.10 Instability 64</p> <p>3.10.1 Living with instability 65</p> <p>3.10.2 Indicators of instability 66</p> <p>3.10.3 Multiple discriminant analysis 66</p> <p>3.11 Credit control 67</p> <p>3.11.1 Debtor days 68</p> <p>3.11.2 Creditor days 68</p> <p>References 68</p> <p>4 Contracts and documentation 70</p> <p>4.1 Types of contract 70</p> <p>4.1.1 Form of tender 71</p> <p>4.1.2 Lump sum contracts 71</p> <p>4.1.3 Measure and value contracts 73</p> <p>4.1.4 Cost reimbursement contracts 73</p> <p>4.2 Financial implications of contracts 75</p> <p>4.2.1 Lump sum contracts 75</p> <p>4.2.2 Measure and value contracts 76</p> <p>4.2.3 Cost reimbursement contracts 77</p> <p>4.3 Project documentation 78</p> <p>4.3.1 Definitions 78</p> <p>4.3.2 Priority of documents 79</p> <p>4.3.3 Drawings 79</p> <p>4.3.4 Specification 80</p> <p>4.3.5 Bills of quantities 82</p> <p>4.3.6 Schedule of rates 84</p> <p>4.3.7 Schedule of works 85</p> <p>References 86</p> <p>5 Payments in construction 88</p> <p>5.1 Industry credit system 89</p> <p>5.1.1 Labour and wages 89</p> <p>5.1.2 Materials 90</p> <p>5.1.3 Subcontractors 90</p> <p>5.1.4 Plant hire 91</p> <p>5.1.5 Credit terms 91</p> <p>5.1.6 Discounts 92</p> <p>5.2 Payment problems 93</p> <p>5.2.1 Trust and money 94</p> <p>5.2.2 The Construction Act 1996 95</p> <p>5.2.3 The Construction Act – scope and application 95</p> <p>5.3 The scheme for construction contracts 96</p> <p>5.4 Payment under the Construction Act 96</p> <p>5.4.1 Payment period 96</p> <p>5.4.2 Periodic payments 97</p> <p>5.5 Payment notification under the Construction Act 97</p> <p>5.5.1 Contractual provisions 97</p> <p>5.5.2 Payment notice 98</p> <p>5.5.3 Default payment notice 98</p> <p>5.5.4 Withholding (or pay-less) notice 98</p> <p>5.6 Conditional payments 99</p> <p>5.6.1 Pay-when-paid 99</p> <p>5.6.2 Pay-when-certified 100</p> <p>5.6.3 Pay-when-notified 100</p> <p>5.7 Late payments 100</p> <p>5.7.1 Legislation 100</p> <p>5.7.2 Interest 101</p> <p>5.8 Suspension of performance 101</p> <p>5.9 Adjudication 102</p> <p>5.10 Value Added Tax 103</p> <p>5.10.1 VAT in construction 103</p> <p>5.10.2 How VAT works 103</p> <p>References 104</p> <p>6 Managing the supply chain 105</p> <p>6.1 Supply chain management 106</p> <p>6.1.1 Definitions 106</p> <p>6.1.2 Integrated supply chains 106</p> <p>6.1.3 Managing cost and profit 107</p> <p>6.1.4 Practical applications 107</p> <p>6.1.5 Context 108</p> <p>6.2 Subcontractors 108</p> <p>6.2.1 The growth of subcontracting 108</p> <p>6.2.2 Types of subcontractors 109</p> <p>6.2.3 Construction Industry Scheme 110</p> <p>6.2.4 Trade and other references 111</p> <p>6.2.5 Bonds 111</p> <p>6.3 Subcontract tenders 112</p> <p>6.3.1 The decision to sublet 112</p> <p>6.3.2 Tender enquiries/send outs 112</p> <p>6.3.3 Scoping of work packages 113</p> <p>6.3.4 Subcontractor selection 114</p> <p>6.3.5 Pre-subcontract stage 114</p> <p>6.4 Subcontract stage 115</p> <p>6.4.1 Placing the subcontract 115</p> <p>6.4.2 ‘Battle of the forms’ 116</p> <p>6.4.3 The discount ‘spiral’ 116</p> <p>6.4.4 Partnering 117</p> <p>6.5 Payment 118</p> <p>6.5.1 Terms of payment 118</p> <p>6.5.2 Retention and defects correction 118</p> <p>6.5.3 Valuations and applications for payment 119</p> <p>6.5.4 Liabilities, claims and accruals 120</p> <p>References 121</p> <p>7 Getting work 122</p> <p>7.1 Business development 122</p> <p>7.2 Decision to tender 124</p> <p>7.3 Competitive tendering 129</p> <p>7.4 Tender lists 130</p> <p>7.4.1 Open competition 131</p> <p>7.4.2 Frameworks and approved lists 131</p> <p>7.4.3</p> <p><i>Ad hoc</i></p> <p>list 132</p> <p>7.5 E-bidding and reverse auctions 134</p> <p> </p> <p>7.5.1 Auctions 134</p> <p> </p> <p>7.5.2 Online and reverse auctions 134</p> <p> </p> <p>7.5.3 The process 135</p> <p> </p> <p>7.5.4 Advantages 135</p> <p> </p> <p>7.5.5 Disadvantages 135</p> <p> </p> <p>References 135</p> <p> </p> <p> </p> <p>8 Corporate governance and management 136</p> <p>8.1 Definitions 137</p> <p>8.1.1 Corporate Governance 137</p> <p>8.1.2 Management 137</p> <p>8.1.3 Directors 137</p> <p>8.2 The UK Corporate Governance Code 138</p> <p>8.2.1 Application 138</p> <p>8.2.2 Principles 139</p> <p>8.2.3 Other approaches to governance 139</p> <p>8.2.4 Corporate governance and contracts 140</p> <p>8.3 Turnover 140</p> <p>8.3.1 Definition 140</p> <p>8.3.2 Calculating turnover 140</p> <p>8.3.3 Work in progress 141</p> <p>8.3.4 Cost of turnover 142</p> <p>8.4 Profit 142</p> <p>8.4.1 Definition 142</p> <p>8.4.2 Corporate profit 143</p> <p>8.4.3 Project profit 144</p> <p>8.4.4 Profit distribution 144</p> <p>8.5 Long-term contracts 145</p> <p>8.6 Management accounts 145</p> <p>8.6.1 Control 145</p> <p>8.6.2 Cost value reconciliation 146</p> <p>8.7 Accounting for contracts 147</p> <p>8.7.1 The role of directors 147</p> <p>8.7.2 Work in progress 148</p> <p>8.7.3 Short-term contracts 149</p> <p>8.7.4 Long-term contracts 149</p> <p>8.7.5 Worked examples 150</p> <p>Reference 152</p> <p>9 Company structure 153</p> <p>9.1 Management functions 153</p> <p>9.1.1 Principles 154</p> <p>9.1.2 Estimating and tendering 155</p> <p>9.1.3 Purchasing 156</p> <p>9.1.4 Production 157</p> <p>9.1.5 Quantity surveying 157</p> <p>9.1.6 Supply chain management 158</p> <p>9.1.7 Accounting 159</p> <p>9.2 Organisation structures 159</p> <p>9.2.1 Structure 160</p> <p>9.2.2 SMEs 163</p> <p>9.2.3 Large firms 163</p> <p>9.2.4 Very large firms 163</p> <p>10 Service departments 165</p> <p>10.1 Estimating and tendering 166</p> <p>10.1.1 Preparing the estimate 168</p> <p>10.1.2 Tender enquires 169</p> <p>10.1.3 Preliminaries 171</p> <p>10.1.4 Employer’s requirements 172</p> <p>10.1.5 Contractor’s requirements 172</p> <p>10.1.6 Measured items 175</p> <p>10.1.7 Attendances and profit associated with domestic</p> <p>subcontract works 175</p> <p>10.2 Tender submission 176</p> <p>10.2.1 Tender margin 176</p> <p>10.2.2 Design risks 177</p> <p>10.2.3 Construction risks/opportunities 177</p> <p>10.2.4 Tender committee 177</p> <p>10.2.5 Final adjustments 178</p> <p>10.2.6 Qualification 178</p> <p>10.2.7 Production of allowance bill 178</p> <p>10.3 Planning 179</p> <p>10.4 Buying 179</p> <p>10.5 Accounting, costs and information 179</p> <p>10.5.1 Definitions of costs 180</p> <p>10.5.2 Timing of cost information flows and reporting 181</p> <p>10.6 Company management accounting systems 181</p> <p>10.6.1 Company information systems 181</p> <p>10.6.2 Contract operational ledger 184</p> <p>10.7 Contract cost reports 190</p> <p>10.7.1 Principle of cost cut off 190</p> <p>10.7.2 Direct costs and accruals 190<br /> <br /> </p> <p>10.7.3 Cumulative and period reporting 194</p> <p>10.7.4 Cost provisions 194</p> <p>10.7.5 Individuals involved 196</p> <p>10.8 Project audits and site processes 196</p> <p>References 197</p> <p>11 Financial management 198</p> <p>11.1 Budgetary control 198</p> <p>11.2 Definitions 200</p> <p>11.2.1 Cost 200</p> <p>11.2.2 Value 200</p> <p>11.3 Cash flow 201</p> <p>11.3.1 Movement of funds 201</p> <p>11.3.2 Cash flow forecasting 202</p> <p>11.3.3 Client and contractor 202</p> <p>11.3.4 Cash flow forecast limitations 203</p> <p>11.3.5 Simple forecasting models 204</p> <p>11.3.6 Credit terms 208</p> <p>11.3.7 Minimum and maximum cash requirements 209</p> <p>11.3.8 Capital lock up 211</p> <p>11.3.9 Expediting receipts 211</p> <p>11.3.10 Delaying payment to suppliers 211</p> <p>11.3.11 Project cash flow 214</p> <p>11.3.12 Organisational cash flow 217</p> <p>11.4 Working capital 218</p> <p>11.4.1 Current assets 218</p> <p>11.4.2 Current liabilities 221</p> <p>11.4.3 Profitability ratio 221</p> <p>References 221</p> <p>12 Project governance 222</p> <p>12.1 Introduction 223</p> <p>12.2 Procurement methods 224</p> <p>12.2.1 Traditional 224</p> <p>12.2.2 Design and build 226</p> <p>12.2.3 Management contracts 227</p> <p>12.2.4 ‘Pain and gain’ systems 228</p> <p>12.2.5 Partnering 229</p> <p>12.3 Conditions of contract 229</p> <p>12.3.1 Payment mechanisms 229</p> <p>12.3.2 Payment procedures 230</p> <p>12.3.3 JCT Standard Building Contract with Quantities 2011 (SBC/Q) 231</p> <p>12.3.4 Infrastructure Conditions of Contract (ICC) – Measurement Version 231</p> <p>12.3.5 NEC Engineering and Construction Contract 3rd Edition 232</p> <p>12.3.6 Other standard forms of contract 232</p> <p>12.3.7 Conditions of subcontract 232</p> <p>12.4 Method of measurement 237</p> <p>12.4.1 Standard methods of measurement 237</p> <p>12.4.2 Basis of quantities 237</p> <p>12.4.3 Classification systems 238</p> <p>12.4.4 SMM rules 239</p> <p>12.4.5 Waste 239</p> <p>12.4.6 Working space 241</p> <p>12.4.7 Temporary works 243</p> <p>12.5 Bills of quantities 244</p> <p>12.5.1 The use of bills of quantities 244</p> <p>12.5.2 Structure and layout 244</p> <p>12.5.3 Preliminaries 245</p> <p>12.5.4 Measured work 247</p> <p>12.5.5 Prime cost sums 250</p> <p>12.5.6 Provisional sums 251</p> <p>12.5.7 Daywork 252</p> <p>12.5.8 Contingencies 253</p> <p>12.5.9 Final summary 254</p> <p>12.5.10 Adjustment item 254</p> <p>References 254</p> <p>13 Budgets 255</p> <p>13.1 Developing and monitoring budgets 256</p> <p>13.2 Types of budget 256</p> <p>13.2.1 Strategic budgets 256</p> <p>13.2.2 Turnover budget 256</p> <p>13.2.3 Overhead budget 257</p> <p>13.3 Project level budgets 259</p> <p>13.3.1 Project turnover budgets 259</p> <p>13.3.2 Project cash budgets 259</p> <p>13.3.3 Production budgets 260</p> <p>13.3.4 Procurement budgets 260</p> <p>13.4 Activity level budgets 262</p> <p>13.5 De-scoping bills of quantities 263</p> <p>13.6 Budget development 264</p> <p>13.6.1 Labour 264</p> <p>13.6.2 Materials 267</p> <p>13.6.3 Plant 268</p> <p>13.6.4 Preliminaries 269</p> <p>13.7 Variance analysis 270</p> <p>13.7.1 Productivity assessment: an example 270</p> <p>13.8 Control procedures 272</p> <p>13.9 Earned value analysis 272</p> <p>13.9.1 Definition of EVA 273</p> <p>13.9.2 The components of EVA 274</p> <p>13.9.3 EVA in practice 275</p> <p>13.9.4 Work breakdown structures 276</p> <p>13.9.5 Establishment of an EVA management system 276</p> <p>13.9.6 Benchmarking project performance using EVA 277</p> <p>13.9.7 Predicting performance 277<br /> <br /> </p> <p>13.9.8 EVA in action: an example 278</p> <p>13.9.9 Making predictions based on the derived metrics 281</p> <p>13.9.10 Benefits of EVMS 282</p> <p>References 282</p> <p>14 Resource procurement 284</p> <p>14.1 Introduction 284</p> <p>14.2 The resource budget 285</p> <p>14.3 Resource procurement programme: subcontractors 285</p> <p>14.4 Tender assessment 286</p> <p>14.5 Tender negotiation 287</p> <p>14.6 Buying gains and losses 287</p> <p>14.7 Newer approaches to subcontract procurement 287</p> <p>14.7.1 Reverse e-auction 288</p> <p>14.7.2 Pre-auction stage 288</p> <p>14.7.3 The auction stage 289</p> <p>14.7.4 Post-auction stage 289</p> <p>14.7.5 Live e-auction results 290</p> <p>14.7.6 Reflections 291</p> <p>14.8 Materials procurement 291</p> <p>14.9 Plant procurement 292</p> <p>14.10 Labour procurement 292</p> <p>14.11 Labour-only subcontractors 293</p> <p>15 Project risk and control 294</p> <p>15.1 Introduction 294</p> <p>15.2 Tender risk 295</p> <p>15.2.1 Programme and method 295</p> <p>15.2.2 Ground conditions 296</p> <p>15.2.3 Subcontractors 299</p> <p>15.2.4 Suppliers and materials 300</p> <p>15.2.5 Commercial opportunity 304</p> <p>15.3 Contract risk 307</p> <p>15.3.1 Delay and disruption 307</p> <p>15.3.2 Delay analysis 308</p> <p>15.4 Claims 311</p> <p>15.4.1 Extensions of time 311</p> <p>15.4.2 Loss and expense 312</p> <p>15.4.3 Evaluating prolongation expenses 314</p> <p>15.5 Insolvency risk 315</p> <p>15.5.1 Risk rating 315</p> <p>15.5.2 Definitions 315</p> <p>15.5.3 Legislation 316</p> <p>15.5.4 Termination of main contracts and subcontracts 317</p> <p>15.5.5 The effect of termination 317</p> <p>15.5.6 Subcontractor’s insolvency 318</p> <p>15.5.7 Employer’s insolvency 323</p> <p>15.5.8 Contractor’s insolvency 324</p> <p>References 328</p> <p>16 Programme and progress 329</p> <p>16.1 Contractor’s obligations 329</p> <p>16.2 Programme 330</p> <p>16.2.1 The tender stage 331</p> <p>16.2.2 The pre-contract stage 333</p> <p>16.2.3 The contract or master programme 334</p> <p>16.2.4 Contractor’s method 337</p> <p>16.2.5 Shortened programmes 337</p> <p>16.2.6 The contract stage 338</p> <p>16.3 Progress 338</p> <p>16.3.1 Contractor’s obligations 338</p> <p>16.3.2 The baseline programme 339</p> <p>16.3.3 Extensions of time 339</p> <p>16.3.4 Mitigation of loss 343</p> <p>16.3.5 Measuring progress 343</p> <p>16.4 S-curves 344</p> <p>16.4.1 Principles 344</p> <p>16.4.2 Measuring physical progress 344</p> <p>16.4.3 Measuring financial progress 345</p> <p>16.5 Project acceleration 349</p> <p>References 351</p> <p>17 Valuations and payments 352</p> <p>17.1 Valuations and interim certificates 353</p> <p>17.1.1 The purpose of valuations 353</p> <p>17.1.2 The timing of valuations 354</p> <p>17.1.3 The timing of interim certificates 354</p> <p>17.1.4 The status of interim certificates 355</p> <p>17.2 Interim payment 355</p> <p>17.2.1 Contractual provisions 355</p> <p>17.2.2 Methods of payment 355</p> <p>17.2.3 Payment notification 356</p> <p>17.2.4 Retention 356</p> <p>17.2.5 Alternatives to retention 357</p> <p>17.3 Principles and procedures 358</p> <p>17.3.1 Valuation principles 358</p> <p>17.3.2 Valuation procedures 359</p> <p>17.3.3 Types of valuation 360</p> <p>17.4 Valuation techniques 362</p> <p>17.4.1 Inspection 362</p> <p>17.4.2 Measurement 362</p> <p>17.4.3 Ogive curve 363</p> <p>17.4.4 Gantt chart 363</p> <p>17.4.5 Adjustment and judgement 363</p> <p>17.5 Materials on site 364</p> <p>17.5.1 Valuing materials on site 364</p> <p>17.5.2 Retention of title 365</p> <p>17.6 Basic valuation procedure 366</p> <p>17.7.1 Contract provisions 370</p> <p>17.7.2 Components of an interim valuation 370</p> <p>17.8 Preparing the external valuation 371</p> <p>17.8.1 Measured work 372</p> <p>17.8.2 Variations 372</p> <p>17.8.3 Daywork 373</p> <p>17.8.4 Prime cost sums 375</p> <p>17.8.5 Provisional sums 377</p> <p>17.8.6 Preliminaries 377</p> <p>17.8.7 Progress 378</p> <p>17.9 Internal valuation 378</p> <p>17.9.1 Purpose 378</p> <p>17.9.2 Link to the external valuation 379</p> <p>17.9.3 Link to the estimate 384</p> <p>17.10 Subcontract valuation 384</p> <p>17.11 Final accounts 386</p> <p>17.11.1 Purpose 386</p> <p>17.11.2 Timing 387</p> <p>17.11.3 Preparation 387</p> <p>17.11.4 The final certificate 389</p> <p>17.11.5 Contractual significance of final certificate 389</p> <p>References 389</p> <p>18 Cost value reconciliation 391</p> <p>18.1 Introduction 392</p> <p>18.1.1 Accounting standards 392</p> <p>18.2 Guiding principles 393</p> <p>18.2.1 Costs 393</p> <p>18.2.2 Site cost information 395</p> <p>18.2.3 Labour 395</p> <p>18.2.4 Materials 397</p> <p>18.2.5 Plant costs 398</p> <p>18.2.6 Subcontract costs 399</p> <p>18.3 Cost reporting 401</p> <p>18.3.1 Timing 401</p> <p>18.3.2 Overheads 403</p> <p>18.4 Net sales value (NSV) 405</p> <p>18.4.1 Calculation of net value 406</p> <p>18.4.2 Calculation of profit 407</p> <p>18.5 Losses 407</p> <p>18.5.1 Foreseeable losses 407</p> <p>18.6 Claims and variations 408</p> <p>18.7 Valuation: application and internal valuation 409</p> <p>18.7.1 Adjustments: overmeasure 411</p> <p>18.7.2 Adjustments: undermeasure 412</p> <p>18.8 Development of the internal valuation: an example 412</p> <p>18.9 Reconciliation 414</p> <p>18.9.1 On-costs in advance 414</p> <p>18.10 Explaining variances 419</p> <p>18.11 Summary 421</p> <p>References 421</p> <p>Glossary 422</p> <p>Index 429</p>
<p>Highly recommended *****</p> <p>Hi guys, thought I would share some thought provoking and agenda stimulating reading I have recently come across. The book is entitled “Financial Management in Constructing Contracting” by Andrew Ross & Peter Williams, but could easily have been called “The Constructor’s Almanac” or “Wisdens Construction Guide“. If you want the “inside line” on construction know how, this book covers it all.</p> <p>From an understated promise to “explain how the financial position on construction contracts is reported” the book expands into every conceivable avenue the authors could explore in their quest to open up, explain, walk through and map, the processes that guide the industry and control the business operation of a construction company, from finance to bidding, managing risk to delivery, and every stop in between.</p> <p>If you are a student, the early chapters on finance, accounting, contracts and procurement, will set out the basics of the industry in straightforward language, lots of good worked examples and clearly labelled diagrams. The later chapters address the subtleties of cash management, budget control, risk and opportunity management, progress monitoring, valuations and cost/value reconciliations, in far deeper detail and with contemporary work sheets to guide you through and explain the complexities of reporting cost and value in equal proportion.</p> <p>The authors have extensive practical experience of the industry, both having risen from the shop floor to the lecture theatre, are suitably qualified to add insight to knowledge and have managed to capture in many ways the essence of the industry, its conflicts, collaborations, power plays and team working. And if you are of the social networking generation there is even a website on which to hone your new found skills. Fully interactive, it provides detailed worksheets and schedules to further explain the lessons contained in the printed version.<br /> <b>—David Monaghan</b></p> <p> </p>
<p><b>Andrew Ross,</b> BSc(Hons) MSc PhD MRICS MCIOB, Head of postgraduate programmes, School of the Built environment, Liverpool John Moores University. Andrew is a chartered quantity surveyor and chartered builder, after graduation he worked as a commercial manager for Balfour Beatty Building and financially managed projects ranging from refurbishment, adaptation of industrial facilities, health care and new build industrial building. He joined Liverpool John Moores University and has an MSc in Information Technology and a PhD in Construction Economics. He has published over 100 journal and conference papers on construction economics and procurement and is the joint author of three text books, Building Design Cost Management, Construction UK and Financial Management for Construction contracting. His current position at LJMU is head of post graduate programmes and he teaches construction project financial management to undergraduate and post graduate students.  He has successfully supervised many PhD students and has been an external examiner to numerous UK and overseas Universities for undergraduate, postgraduate and research degree courses.</p> <p><b>Peter Williams</b> is a Consultant and Lecturer with extensive practical experience in building, civil engineering and surveying. Formerly a chartered builder, chartered quantity surveyor and principal lecturer, he is now a writer, researcher, lecturer and consultant with particular interests in contracts and finance, delay analysis and health and safety management.</p>
<p><b>Financial Management in Construction Contracting<BR> Andrew Ross & Peter Williams</b> <p>This authoritative text provides a detailed insight into how construction companies manage their finances at both corporate and project level. It guides students and practitioners through the complexities of the financial reporting of construction projects within the constraints of accepted accounting practice. The book is written for non-accountants and from a contractor’s perspective and is equally relevant to subcontractors and main contractors. <p>The authors examine the relationship between the external annual accounts and the internal cost-value reconciliation process. CVR is covered in depth and the authors consider issues such as interim payments, subcontract accounts, contractual claims, final accounts, cash flow management and the reporting of the physical and financial progress of contracts. <p>A broad perspective of all the financial aspects of contracting is taken along with related legal issues and the authors explain how things operate in the ‘real world’. They describe good practice in financial control while at the same time being honest about some of the more questionable practices that can - and do - happen. The approach taken is unique as the financial management of construction projects is considered from the perspective of the contractor’s quantity surveyor. The book deals with the real issues that surveyors have to address when using their judgment to report turnover, profitability, cash flow, and work in progress on projects and the financial problems faced by subcontractors are frankly and pragmatically explored. <p>The payment and notice requirements of the Construction Act are explained in detail and relevant provisions of JCT2011, NEC3, ICC, DOM/1 and other standard contracts and subcontracts are also covered. <p><b>Financial Management in Construction Contracting</b> addresses the wide variety of external factors that influence how construction companies operate, including government policy, banking covenants and the financial aspects of supply chain management. Cost reporting systems are described and real-life examples are used to illustrate cost reports, accrual systems and how computerised systems can be employed to provide the QS with information that can be audited. <p>This is the ideal core text for final year degree and post-graduate students and provides an invaluable reference source for all engaged in the financial management of construction projects. <p>This book’s companion website is at <b>www.wiley.com/go/rossfinancialmanagement</b> and offers invaluable resources for both students and lecturers: <ul><li>PowerPoint slides for lectures on each chapter</li> <li>Excel worksheets to practice what you learn</li> <li>Sample valuations and cashflows</li></ul>

Diese Produkte könnten Sie auch interessieren:

Water Quality Hazards and Dispersion of Pollutants
Water Quality Hazards and Dispersion of Pollutants
von: Wlodzimierz Czernuszenko, Pawel Rowinski
PDF ebook
149,79 €
Energy and Environment
Energy and Environment
von: Richard Loulou, Jean-Philippe Waaub, Georges Zaccour
PDF ebook
96,29 €